

EXPERIENCE


Shann Lane Project, Keighley, United Kingdom
SUMMARY DATA
Derrick A McLean - Construction Director: - MF Construction & Developments Ltd.
Derrick has been involved in projects throughout the UK specialising in light gauge steel frame systems.
He has been involved in projects globally on both residential and commercial schemes.
Derrick’s 40 years construction experience has given him an understanding of the key requirements needed in today’s UK market.
Key Qualifications
Level 7 NVQ Deploma in Construction Senior Management
CSCS Senior Construction Management {Black Card}
SMSTS
First Aid
NHBC – CDM Procedures certificate
City & Guilds - Bricklaying
TYPE OF PROJECTS:
Residential
Commercial
EMPLOYERS - Present Day:-
DMC Residential Projects Ltd
MF Construction & Developments Ltd
DMC Procurement Limited
DMC Global Holdings Ltd
​
​
EMPLOYERS - Past:-
Box Ridge Homes Limited
DMC Global Construction Ltd
DMC Global Group Ltd
Bovis Homes Ltd
Scandinavian Homes Ltd
McLean Construction Ltd
Futureform Design & Build
Spaceover
Taylor Woodrow Developments Ltd
​
​
DMC HISTORY
Derrick A McLean - Managing Director - {DMC Global Group - April 2013 – 29th May 2018
​
DMC Global Construction/Project Management services for:-
​
FUTUREFORM MODULAR LTD – Principal Contractors
PROJECT: 2016 – November 2017.
1 Hockley Road, Nottingham,
Appointed in 2016 to build an 8 storey building to create ground floor to basement retail with 131 student apartments.
The project design stage started on the 2-2-2016.
DMC Global where appointed on the 2-2-2016 as the project design coordinators to drive the project on behalf of the principal contractor.
.
The Construction phase started on site on the 16-5-2016.
The project got so far as the basement works which involved the locating & the filling in of underground Caves with concrete, with the caves being as low as 7 meters below ground level
Around 40% of the basement construction works where completed before works ceased on site in May 2017 due to the previous owners going into administration.
DMC Global where appointed by the administrators in November 2017 to June 2018 to oversee & provide the Health & Safety, the Security & relevant Insurances for the 1 Hockley site until new owners/purchasers where found for the site.
We at DMC Global Construction are now continuing with completing the site with the new owners Marfleet Estates Ltd by way of providing Construction Management services on Anchor House Construction's their behalf, right up to completion of the project in readiness for the student tenants occupation in 2020.
Project Value: £11m
​
PROJECT: 2015 – 2016
Construction Site Manager (DMC Global Construction Management services)
Berkeley Homes (Kent) Ltd, Holborough Lakes, Snodland
Residential Development of 1,250 dwellings
Set in a redundant quarry adjacent to the Medway town of Snodland, Holborough is a unique development site of 1,250 dwellings set amongst attractive landscaping and water features. The Masterplan for the site is divided into 12 separate phases with their own distinct character and identity, but still respecting the traditional Kent vernacular.
The first phases have been built in a ‘New England’ style in various colours of weatherboarding. The entrance ‘Boulevard’ leads past a linear form of apartments either side of a tree lined avenue to the rest of the development. Later phases include contemporary lakeside apartments, a convenience store, gym and further dwellings to complete the transition to the Kent vernacular.
Project value £20 million.
​
​
PROJECT: 2015
Construction Site Manager (DMC Global Construction Management services)
Erith Park | Wates Living Space, Waterhead Close, Off Larner Road, Erith, Kent, DA8 3RJ
A part of a site team in the delivery of a 620-home regeneration of Larner Road in Erith in London Borough of Bexley.
Orbit will replace six high-rise blocks with 620 family homes for around 2,000 people, the work started on site March 2013.
The five-year scheme is being funded by the Homes & Communities Agency and represents one of the largest projects of its type in London. Other partners are LB Bexley and architects Broadway Malyan.
The development is co-ordinated by Orbit Homes and the area managed by Orbit South. It is a mix of houses and low rise apartments for rent, sale and low cost home ownership.
This project is nearing the end of phase 1, start of phase 2.
Project value, £128m
PROJECT: 2014 - 2015
Construction Site Manager (DMC Global Construction Management services)
Balfour Beatty,Winterfield and Stepstile, Temple way ME9 6SH
70 plots consisting of 2 blocks flats 15 flats per block in Timber frame construction. 40 no traditional build 1,2 & 3 storey houses.
​
Project Value, £11m
PROJECT: 2013 – 2014
Construction Manager/ Director /Principle Contractor (DMC Global Construction Management services)
The Princes Foundation
Dumfries Estate,
Scotland
Ideal Homes Exhibition, SEC Glasgow
Ideal Homes Exhibition, Earls Court London
The Modular steel frame & timber frame construction of 3 residential units with associated fit out. The project involved the off-site construction of modular units, transportation to each of the Ideal Home Exhibition shows, (Earls Court & SECC Scotland). The onsite construction & finishes. Following on from the shows. The units were then transported to the Dumfries House Estate (owned by HRH Prince Charles), where they are now inhabited by some of the Royal Staff
Project Value: £2m
PROJECT: – Rainham, Essex
The Construction of a new Panelised steel frame show home built within an industrial unit to HA spec (Code 5)
Project Value - £150,000
Responsible for the full project from initial planning, supervising the off-site construction of the modular units (Manufactured in China by CMBN), logistics, onsite construction, liaising with all stakeholders, health & safety and quality.
PROJECT: 2013 - 2014
BOVIS HOMES
Site Manager (DMC Global Construction Management services)
Abbey Place – Minster, Isle of Sheppey
Multi-phase development of traditional build housing. Current phase totals 50+ units.
Responsible for preparing units for CML, customer care, NHBC inspections and HA inspections.
Langshott Park – Horley, Surrey
A phase of 28 traditional build HA units comprising of apartments and houses. Responsible for taking units from foundations through to handover.
Responsible for short-term programs and maintaining master program, coordinating & managing subcontractors, ordering materials & plant, progress reporting to a visiting Contracts Manager, Health & Safety, site inspections, snagging & de-snagging, preparing units for CML, NHBC & HA inspections, handovers and customer care.
PROJECT: 2012 -2013
SCANDINAVIAN HOMES LTD Construction Director
Responsible all construction projects from initial planning, the off-site construction of the timber framed panelised units manufactured by Gotenhus of Sweden, (the 2nd largest Housing developer in Sweden) logistics, onsite construction, liaising with all stakeholders, health & safety and quality.
PROJECT: 2012 - 2013
MCLEAN CONSTRUCTION LTD
Construction Manager/ Director
The Princes Foundation – Earls Court
Constructed 3 houses at the Ideal Home Exhibition, Earls Court London. Modular steel frame & timber frame construction with associated fit out.
Project Value - £800,000
The Princes Foundation: Heyford Park – Upper Heyford
Refurbishment of two, four bedroom steel frame modular built houses.
Off-site Project Value - £1.2m
PROJECT: 2012 & 2013
Goodwood Motor Circuit: Claypit Lane – Chichester
4 steel frame retail units.
Project Value - £280,000 for each season.
PROJECT: 2008 - 2012
FUTUREFORM DESIGN & BUILD LTD. Construction/Contracts Manager.
Ideal Homes Village (Ideal Homes Exhibition) – Earls Court & Scotland
Steel frame and modular build construction of 2 & 3 storey residential units built to code level 4 & 5 and constructed within 4 days. Built for the Princes Foundation.
MACE (Victoria Halls) – Wembley, London
20 storey 430 room modular build student accommodation complex. Construction method comprised of a single RC core with 3 wings of steel frame modular construction.
Package Value - £9m
Project Value - £23m
South Chase Newhall– Harlow, Essex
100 HA & residential units built in steel frame and modular build construction.
Project Value £17.5m
St Quintin View – White City, London
Steel frame/modular build mixed use development comprising of retail & commercial on the ground floor with 47 HA apartments.
​Heathway Villas – Haringey, London
11 steel frame code 4 HA residential units.
Responsible for health & safety plans (RAMS, crane operations, inductions), programes of work, management of a team of Site Managers & Site personnel. Security plans & haulage, site inspections, liaising with Mace & stakeholders, site inspections and handovers.
Stadium Housing – London
Project Value - £5m
​
​
PROJECT: 2006 – 2008
SPACEOVER (MODULAR DESIGN & BUILD ARM OF SPACEOVER GROUP)
Contracts Manager
Network Housing – Twickenham, London
Constructed 25 residential flats, which was a combination of modular and traditional build
Project Value - £5m
​
47 modular and traditional build key worker flats.
​
The health and safe on these projects were taken to the highest level as this entailed articulated lorries, loaded with modules weighing 9-11 Tons, being safely co-ordinated with a range of 100 ton to 350 ton cranes lifting in modules in busy built up areas and with high speed Network Rail lines within 6 metres of the site boundary. This meant working closely with Council officials at the highest level and gaining their trust as a competent as a safety aware builder.
Project Value - £3.5m
​
2002 – Jan 2006
TAYLOR WOODROW HOMES (BRYANT HOMES)
Site Manager
Kemsley Fields - Sittingbourne
200 plots of traditional build houses & flats.
Dunton Green – Sevenoaks - (next to Dunton Green Train Station)
42 plots, 28 flats, 14 town houses – all timber frame. Site completed successfully including all CML’s on time. 30% site for Moat Housing Group.
Demontfort Park – Singleton, Ashford
Returned to Singleton Hill, Ashford project as Site Manager to complete site for year end. This was achieved successfully including all CML’s.
Silverdale – Kennington, Ashford
Opportunity to complete phases 6 & 7 of an old Wilson Connolly site. The final two phases comprised of 50 timber frame units at varying stages of construction.
Demontfort Park – Singleton, Ashford, kent
77 traditional build plots.
Queens Road – Barming, Maidstone
200 traditional build plots comprising of houses and apartments with a social housing element.
1979 – 2002
SUB-CONTRACTOR BRICKWORK FOREMAN/ SUPERVISOR
Bricklaying Foreman/Supervisor.
​

I Hockley - Project,
Nottingham,
United Kingdom

